Skip to content

Applications

What Can We Do For You?

Enhanced Drilling is a provider of specialist drilling technology and services to the offshore oil and gas industry.

Our unique pump technology helps oil companies around the world to solve challenges on all types of subsea wells, from the top-hole and all the way down to the reservoir.

Read more about the challenges we can remediate for you: 

Managed Pressure Gravel Packing

EC-Drill®

Read More

Narrow Operating Windows

EC-Drill®

Read More

Depletion

EC-Drill®

Read More

Drilling Top-Holes

RMR® / MPC®

Read More

Managed Pressure Drilling

EC-Drill®

Read More

Deepwater and Ultra Deepwater Drilling

EC-Drill®

Read More

Cuttings Build-Up

RMR®

Read More

Shallow Flow Hazards

RMR® / MPC®

Read More

Environmentally Sensitive Areas

RMR®

Read More

Managed Pressure Cementing

EC-Drill® / MPC®

Read More

Lost Circulation

EC-Drill®

Read More

Track Record

Our track record in the field is extensive, with 1000 wells surpassed for our RMR® and CTS technologies. Around the world, Enhanced Drilling's solutions have been enabling some of the most respected operators in the industry to drill with confidence, create new drilling opportunities and to stay on schedule - cost effectively.

0
0

Track record

See Rig Reference List 

What To Expect When Working With Us

1. Well Evaluation

After the first contact has been made, Enhanced Drilling will send out an “Well information datasheet” in order to gather all necessary information about the well. We use this information to ensure that the right system and tools are put together for the client needs.

For EC Drill project, Enhanced Drilling can also do a preliminary well evaluation using licensed software to evaluate what benefits can be achieved by utilizing the system.

2. Rig Visit

In order to ensure a seamless installation of the system, we perform a site survey of the rig. The survey is documented by a report and shared with the client.

Enhanced Drilling has been mobilized to most rigs in Europe, and in cases where it is less than six months since the last mobilization, a physical survey might not be necessary.

3. Project Planning / Documentation

When all data has been collected and evaluated, Enhanced Drilling appoint a project team lead by the Project Manager. We will now start to plan the job together with you as a customer.

The planning includes participating in DWOP meetings, testing and packing the equipment, making detailed operations procedures, and engineering.

Enhanced Drilling has an inhouse engineering department with multidiscipline capacity including design engineering and drilling engineers.

4. Shipment and Installation

When the equipment is tested and packing is completed, it is sent to the Company’s dedicated supply base for mobilization on the rig. Shortly after, the offshore team of 4 is also mobilized to start installing the system.

After the system is installed on the rig, we do a commissioning before we are ready for operation.

5. Post Job Report

After the job is completed, the Project Manager compiles and delivers a post job report where the job is evaluated and measured to assess how well the success criteria for the job have been met. We go through all aspects of the well where we have been involved, and fully contribute to all after-action processes.

We complete the job by inviting the client to rate the performance of our job from start to finish by sending out a one-page grading sheet covering all phases of the job.

 

Case Studies

See how our customers solved their subsea drilling challenges using our technology.

Read Case Studies
Case Studies

Watch Webinars

Our in-house experts have made a series of MPD- focused webinars. Watch them here.

Watch Webinars
Watch Webinars - See case study

Your Expert

Bernt Eikemo

Vp sales

Mobile:+47 97 72 77 60
Send email

Get in Touch