EC-Drill® FAQs
EC-Drill® is a Controlled Mud Level (CML) system that enables operators to 'drill the undrillable' well. It solves a long-standing challenge commonly
- How fast can EC-Drill® be mobilized?
- What pressure can this system withstand?
- What is the power requirement?
- Does the EC-Drill® system affect Barriers and Well Control?
- How deep in the water column is the EC-Drill® pump installed?
- How do you fill the riser if required?
- What is the maximum flowrate the SPM can deliver?
- Do I need to change EC-Drill® between sections?
- Do you need a MPD ready rig?
- What are the applications?
- How do you control the level of fluid in the riser?
- Any plans for subsea pump design to allow us to go deeper?
- When should EC-Drill® be included in well planning?
- Can this system completely replace the conventional MPD system?
- How do you connect umbilical and mud returnline to the SPM?
- Can riser level be monitored during a power outage?
- Does EC-Drill® interfere with MWD/LWD or BHA equipment?
- What are the main equipment elements of EC-Drill®?
- What is CMCD?
- Is influx into the system acceptable?
- What are the recovery methods if the riser pump fails?
- How much rig preparation does EC-Drill® require?
- What is the criteria of the motors (poles, power, flow range)?
- What certification experience does Enhanced Drilling have?
- Can you combine EC-Drill®, RMR®, MPC and CTS?
- How accurately can the EC-Drill® system control the riser pressure?
- What rig modifications does EC-Drill® require?
- Can I use EC-Drill® with any mud type?
- What is the top fill pump and what are the requirements?
- What is an EC-Drill® ready rig?
- Where has EC-Drill® been used?
- When can EC-Drill® be used?
- What is EC-Drill®?
- What redundancy features do you have in the SPM?
- Do you need RCD with EC-Drill®?
- Can I perform cementing operations with EC-Drill®?
- What are some of the additional benefits?
- How is the riser level monitored?
- What competency training is generally needed for rig site personnel?
- What are the mud return line (MRL) option?
- Do we need to modify the kick evacuation procedures with your system?
- Is EC-Drill® pump installation weather dependent?