Is influx into the system acceptable?
Large gas influxes are not pumpable by the EC-Drill® system; standard well control procedures apply. New riser isolation technology will improve kick management without BOP closure.
Our pumps cannot pump gas, so if a large, concentrated influx gets as far as our pumps they will not be able to pump. In an influx situation, standard well control procedures will be used. Influx Management can be done with the EC-Drill® Dual MPD system.