Skip to content
  • There are no suggestions because the search field is empty.

Do you need a MPD ready rig?

EC-Drill® does not require an MPD-ready rig and can be installed on any offshore mobile drilling unit with minimal surface pipework, making integration straightforward.

EC-Drill® does not require a MPD ready rig as it can install on any offshore mobile drilling unit. The surface pipework that is required by EC-Drill® is minimal. If the rig is “MPD ready” for Surface Back Pressure (SBP) MPD, some of this pipe work can likely be used, but the amount EC-Drill® surface pipework is small, and this would not be a major factor in installation of EC-Drill® on a rig.