RMR FAQs
- Which water depth can RMR be used in?
- How is the system deployed to the seabed?
- What modifications are needed for Managed Pressure Cementing (MPC) of topholes?
- Can it be used without a template or wellhead housing?
- Are there alternatives to using a flexible hose for the Mud Return Line (MRL)?
- Can the system be back-flushed in case of gumbo?
- Can the system be operated manually if the control system fails?
- Are there plans to develop RMR for deeper waters?
- Can the equipment be pre-laid on the seabed, and are mud mats required?
- How is the flow rate monitored on surface?
- Can it be used on all templates and wellheads?