Skip to content
  • There are no suggestions because the search field is empty.

How is the system deployed to the seabed?

The Subsea Pump Module (SPM) is deployed over the side of the rig using the umbilical winch. The Mud Return Line (MRL) is deployed separately, either from a hose-handling platform or a hose reel. 

When RMR is combined with EC-Drill®, the SPM can also be deployed on a hard pipe that doubles as the MRL.